Thursday, 31st July 1913 Gantt, Once Phagan Suspect, On Stand Wednesday Afternoon
Atlanta Constitution
July 31st, 1913
J. W. Gantt, who once was a suspect in the famous case, followed Mrs. Coleman to the stand at the afternoon session.
"Have you ever been connected with the pencil company?"
"From January 1st, 1918, until April 7, I was employed with that concern as shipping clerk. I was discharged by Mr. Frank for an alleged shortage."
"Did you know Mary Phagan?"
"Yes—I knew her as a little girl."
"Did Leo Frank know her?"
"Yes."
"How do you know this?"
Knew Mary Pretty Well.
"On Saturday she came into the office for a time record. Frank came in and said, ‘You seem to know Mary pretty well?'"
"When was that?"
"Some time since Christmas."
"How intimate were you with Mary?"
"I knew her when she was a child."
"How far did you work from her?"
"I worked in the office and she worked in the rear."
"In reference to Frank how were you located?"
"We were in the same office."
"How many girls worked in Mary's department?"
"Three others beside herself."
"Did Frank see you when you're turned to the factory after you discharge?"
"Yes."
"What about one girl getting another's pay envelope at the girls' request?"
"It was frequently done."
"Explain everything with reference to your alleged shortage."
The Alleged Shortage.
"A boy came back from my department with a $3 shortage. He went to Mr. Frank. Mr. Frank came and asked me about it. I told him I knew turned to the factory after your discharged."
"How about the punch clock near Frank's office? Would it take much time to read the slip—and to learn to read it?"
"Only about five minutes."
"Previously, who took your place at the factory?"
"I don't know."
"Previous to your discharge had Frank ever commended you?"
"He said I was as good a workman as he had ever had."
"Do you know the exact location of clock? Could Frank, from his desk, see the employees register upon it?"
"If the safe door was closed."
"Did you know how to fix the clock?"
"Yes, Mr. Frank taught me."
Wanted to Get Shoes.
"On April 26, when did you first see Frank?"
"At 6 o'clock that afternoon at the factory entrance. He saw me at the door talking to Newt Lee. He came down to within fifteen feet from door and stopped. He saw I was looking at him and advanced toward me. I told him I had two pair of shoes in the factory and wanted to get them. He told me he had seen a negro sweeping a pair out of the place. I went in and found both pair after he had given me consent to enter the factory."
"Did you look at Frank? If so, describe his appearance."
"He was nervous and pale. He hung his head and hesitated."
"Did he jump?"
"Yes."
"How?"
"He just stepped back kinder startled."
"Did he look at you?"
"No. He hung his head."
Rosser began cross-examination by reading extracts of Gantt's statement before the coroner's jury."
"You'll admit to this," he said reading from his notes, "I never saw Mary Phagan in Frank's company. Never knew he was acquainted with her?"
"Yes."
"You may come down."
Court then adjourned until Thursday morning.
- Monday, 28th April 1913 Girl is Assaulted and then Murdered in Heart of Town, The Atlanta Constitution [Last Updated On: April 18th, 2024] [Originally Added On: December 5th, 2021]
- Monday, 28th April 1913 Mullinax Held in Phagan Case [Last Updated On: October 19th, 2023] [Originally Added On: December 4th, 2021]
- Tuesday, 29th April 1913 $1,000 Reward [Last Updated On: October 19th, 2023] [Originally Added On: November 30th, 2021]
- Tuesday, 29th April 1913 “Every Woman and Girl Should See Body of Victim and Learn Perils” [Last Updated On: February 20th, 2023] [Originally Added On: December 3rd, 2021]
- Tuesday, 29th April 1913 I Am Not Guilty, Says John M. Gantt [Last Updated On: September 6th, 2023] [Originally Added On: December 1st, 2021]
- Tuesday, 29th April 1913 Pinkertons Hired to Assist Police Probe the Murder of Mary Phagan [Last Updated On: September 6th, 2023] [Originally Added On: December 2nd, 2021]
- Tuesday, 29th April 1913 Was Victim of Murder Lured Off on Joy Ride Before She Met Death? [Last Updated On: February 20th, 2023] [Originally Added On: November 29th, 2021]
- Tuesday, 29th April 1913 Who Saw Pretty Mary Phagan After 12 OClock on Saturday? [Last Updated On: February 20th, 2023] [Originally Added On: November 28th, 2021]
- Wednesday, 30th April 1913 City to Offer $1,000 for Slayers Arrest [Last Updated On: March 10th, 2023] [Originally Added On: November 23rd, 2021]
- Wednesday, 30th April 1913 Did Murderers Plan Cremation? [Last Updated On: March 10th, 2023] [Originally Added On: November 19th, 2021]
- Wednesday, 30th April 1913 Factory Clock Not Punched for Hours on Night of Murder [Last Updated On: March 10th, 2023] [Originally Added On: November 26th, 2021]
- Wednesday, 30th April 1913 Gantt Turned Over to Sheriff of Fulton [Last Updated On: March 11th, 2023] [Originally Added On: November 20th, 2021]
- Wednesday, 30th April 1913 Inquest This Morning. [Last Updated On: March 11th, 2023] [Originally Added On: November 27th, 2021]
- Wednesday, 30th April 1913 Leo M. Frank Holds Conference With Lee [Last Updated On: March 11th, 2023] [Originally Added On: November 25th, 2021]
- Wednesday, 30th April 1913 Mayor Confers with Chief; Says Extras are Misleading [Last Updated On: March 14th, 2024] [Originally Added On: November 22nd, 2021]
- Wednesday, 30th April 1913 Murder Analyzed By Dr. MKelway [Last Updated On: March 11th, 2023] [Originally Added On: November 21st, 2021]
- Wednesday, 30th April 1913 Shot Fired Near Lee May Break His Nerve [Last Updated On: March 11th, 2023] [Originally Added On: November 18th, 2021]
- Wednesday, 30th April 1913 While Hundreds Sob Body of Mary Phagan Lowered into Grave [Last Updated On: March 11th, 2023] [Originally Added On: November 24th, 2021]
- Thursday, 1st May 1913 City Offers $1,000 Reward for Capture of Phagan Slayers [Last Updated On: March 11th, 2023] [Originally Added On: November 16th, 2021]
- Thursday, 1st May 1913 Frank Not Apparently Nervous Say Last Men to Leave Factory [Last Updated On: March 13th, 2023] [Originally Added On: November 15th, 2021]
- Thursday, 1st May 1913 Frank Tried to Flirt With Murdered Girl Says Her Boy Chum [Last Updated On: March 23rd, 2023] [Originally Added On: November 17th, 2021]
- Thursday, 1st May 1913 Girl Was Dead Ten Hours Before Her Body Was Found [Last Updated On: March 23rd, 2023] [Originally Added On: November 13th, 2021]
- Thursday, 1st May 1913 Has a New Explanation [Last Updated On: March 23rd, 2023] [Originally Added On: November 11th, 2021]
- Thursday, 1st May 1913 Newt Lee Tells His Story During Morning Session [Last Updated On: March 23rd, 2023] [Originally Added On: November 14th, 2021]
- Thursday, 1st May 1913 Pretty Young Sweetheart Comes To the Aid of Arthur Mullinax [Last Updated On: March 24th, 2023] [Originally Added On: November 12th, 2021]
- Friday, 2nd May 1913 Frank and Lee Held in Tower; Others Released [Last Updated On: March 24th, 2023] [Originally Added On: November 10th, 2021]
- Saturday, 3rd May 1913 Not Guilty, Say Both Prisoners [Last Updated On: March 27th, 2023] [Originally Added On: November 9th, 2021]
- Sunday, 4th May 1913 Impostors Busy in Sleuth Roles in Phagan Case [Last Updated On: March 27th, 2023] [Originally Added On: November 8th, 2021]
- Sunday, 4th May 1913 The Case of Mary Phagan [Last Updated On: March 27th, 2023] [Originally Added On: November 7th, 2021]
- Monday, 5th May 1913 Sleuths Believe They Can Convict Phagan Murderer [Last Updated On: March 27th, 2023] [Originally Added On: November 6th, 2021]
- Monday, 5th May 1913 Women Inspectors Urged to Protect Factory Girls [Last Updated On: March 28th, 2023] [Originally Added On: November 5th, 2021]
- Tuesday, 6th May 1913 Pistol Toting is Condemned by Judge Ellis in His Charge [Last Updated On: March 28th, 2023] [Originally Added On: November 2nd, 2021]
- Tuesday, 6th May 1913 Probe Phagan Case Grand Jury Urged [Last Updated On: March 28th, 2023] [Originally Added On: November 3rd, 2021]
- Tuesday, 6th May 1913 Third Man Brought into Phagan Mystery by Frank’s Evidence [Last Updated On: March 28th, 2023] [Originally Added On: November 4th, 2021]
- Wednesday, 7th May 1913 Detective Chief Fired for Arresting Bowen as a Phagan Suspect [Last Updated On: March 31st, 2023] [Originally Added On: October 31st, 2021]
- Wednesday, 7th May 1913 Officials Plan to Exhume Body of Victim Today [Last Updated On: March 28th, 2023] [Originally Added On: November 1st, 2021]
- Thursday, 8th May 1913 Frank Will Take Stand at Inquest [Last Updated On: March 28th, 2023] [Originally Added On: October 29th, 2021]
- Thursday, 8th May 1913 Greeks Make Protest [Last Updated On: March 28th, 2023] [Originally Added On: October 28th, 2021]
- Thursday, 8th May 1913 Stains of Blood on Shirt Fresh, Says Dr. Smith [Last Updated On: March 29th, 2023] [Originally Added On: October 30th, 2021]
- Friday, 9th May 1913 Frank and Lee Ordered Held by Coroner’s Jury for Mary Phagan Murder [Last Updated On: March 30th, 2023] [Originally Added On: October 27th, 2021]
- Friday, 9th May 1913 Woman’s Handkerchief Brought to Officers [Last Updated On: March 30th, 2023] [Originally Added On: October 26th, 2021]
- Saturday, 10th May 1913 Girl Will Swear Office of Frank Deserted Between 12:05 and 12:10 [Last Updated On: March 30th, 2023] [Originally Added On: October 25th, 2021]
- Sunday, 11th May 1913 Mystery of 14-Year-Old Mary Phagans Tragic End Adds One to Long List of Atlantas Unsolved Crimes [Last Updated On: April 13th, 2023] [Originally Added On: October 23rd, 2021]
- Sunday, 11th May 1913 Officer Swears He Found Frank With Young Girl [Last Updated On: April 13th, 2023] [Originally Added On: October 24th, 2021]
- Monday, 12th May 1913 Find Guilty Man, Franks Lawyer Told Pinkertons [Last Updated On: April 13th, 2023] [Originally Added On: October 22nd, 2021]
- Monday, 12th May 1913 The Phagan Case Day by Day [Last Updated On: April 13th, 2023] [Originally Added On: October 21st, 2021]
- Tuesday, 13th May 1913 My Son Innocent, Declares Mother of Leo M. Frank [Last Updated On: April 13th, 2023] [Originally Added On: October 20th, 2021]
- Tuesday, 13th May 1913 Mystery Within a Mystery Now Baffling Newspaper Men Working on the Phagan Case [Last Updated On: April 13th, 2023] [Originally Added On: October 19th, 2021]
- Wednesday, 14th May 1913 Clue is Sought in Handwriting of Mary Phagan [Last Updated On: April 13th, 2023] [Originally Added On: October 18th, 2021]
- Thursday, 15th May 1913 Victim of Murder Prepared to Die, Believes Dorsey [Last Updated On: April 13th, 2023] [Originally Added On: October 17th, 2021]
- Friday, 16th May 1913 Coming of Burns is Assured, Says Colonel Felder [Last Updated On: April 13th, 2023] [Originally Added On: October 16th, 2021]
- Friday, 16th May 1913 Constitution Starts Fund to Bring Burns Here to Solve the Mary Phagan Murder Mystery [Last Updated On: April 13th, 2023] [Originally Added On: October 15th, 2021]
- Saturday, 17th May 1913 In Loop of Death Dorsey May Have Clue to Murderer [Last Updated On: April 13th, 2023] [Originally Added On: October 14th, 2021]
- Sunday, 18th May 1913 Three Arrests Expected Soon in Phagan Case [Last Updated On: April 13th, 2023] [Originally Added On: October 13th, 2021]
- Monday, 19th May 1913 Detectives Seek Clue in Writing of Negro Suspect [Last Updated On: April 13th, 2023] [Originally Added On: October 12th, 2021]
- Tuesday, 20th May 1913 Women Declare Phagan Murder Must Be Solved [Last Updated On: April 13th, 2023] [Originally Added On: October 11th, 2021]
- Wednesday, 21st May 1913 Tobie is Studying Mary Phagans Life [Last Updated On: April 13th, 2023] [Originally Added On: October 10th, 2021]
- Thursday, 22nd May 1913 Experts Are Here on Finger Prints [Last Updated On: April 13th, 2023] [Originally Added On: October 9th, 2021]
- Friday, May 23rd, 1913, Rooming House Sought by Leo Frank Declares Woman, Atlanta Constitution [Last Updated On: May 3rd, 2024] [Originally Added On: October 8th, 2021]
- Saturday, 24th May 1913 A. S. Colyar Makes Answer to Charges of Col. Felder [Last Updated On: April 13th, 2023] [Originally Added On: October 1st, 2021]
- Saturday, 24th May 1913 Bribery Charges False Declares Col. Felder; Calls Them Frame-Up [Last Updated On: April 13th, 2023] [Originally Added On: October 6th, 2021]
- Saturday, 24th May 1913 Career of A. S. Colyar Reads Like Some Story In the Arabian Nights [Last Updated On: April 13th, 2023] [Originally Added On: October 5th, 2021]
- Saturday, 24th May 1913 Chief Beavers Not Surprised at Col. Felders Statements [Last Updated On: February 20th, 2023] [Originally Added On: September 30th, 2021]
- Saturday, 24th May 1913 Coleman Affidavit Which Police Say Felder Wanted [Last Updated On: February 20th, 2023] [Originally Added On: October 3rd, 2021]
- Saturday, 24th May 1913 Felder is Charged with Bribe Offer for Phagan Papers [Last Updated On: August 13th, 2023] [Originally Added On: September 28th, 2021]
- Saturday, 24th May 1913 Frank Not Home Hours on Saturday Declares Lanford [Last Updated On: February 20th, 2023] [Originally Added On: October 7th, 2021]
- Saturday, 24th May 1913 Girl Strangled, Says Indictment [Last Updated On: February 20th, 2023] [Originally Added On: September 29th, 2021]
- Saturday, 24th May 1913 Mayor Woodward Reported Caught by the Dictograph Seeking Police Evidence [Last Updated On: February 20th, 2023] [Originally Added On: October 4th, 2021]
- Saturday, 24th May 1913 Solicitor General Dorsey Talks of the Bribe Charge [Last Updated On: February 20th, 2023] [Originally Added On: October 2nd, 2021]
- Sunday, 25th May 1913 Becker of South Lanford is Branded by Col. Tom Felder [Last Updated On: February 20th, 2023] [Originally Added On: September 27th, 2021]
- Sunday, 25th May 1913 C. W. Tobie, Burns Agent, Tells of the Conferences He Held With A. S. Colyar [Last Updated On: February 20th, 2023] [Originally Added On: September 14th, 2021]
- Sunday, 25th May 1913 Charge Framed Up by a Dirty Gang [Last Updated On: February 20th, 2023] [Originally Added On: September 18th, 2021]
- Sunday, 25th May 1913 Colyar a Success in Preacher Role [Last Updated On: February 20th, 2023] [Originally Added On: September 26th, 2021]
- Sunday, 25th May 1913 Colyar Declared Criminal and Not Worthy of Belief in Four Sworn Statements [Last Updated On: February 20th, 2023] [Originally Added On: September 17th, 2021]
- Sunday, 25th May 1913 Felders Charges of Graft Rotten [Last Updated On: February 20th, 2023] [Originally Added On: September 19th, 2021]
- Sunday, 25th May 1913 Frank Indicted in Phagan Case [Last Updated On: February 20th, 2023] [Originally Added On: September 21st, 2021]
- Sunday, 25th May 1913 Frank is Praised by John O. Parmele [Last Updated On: February 20th, 2023] [Originally Added On: September 16th, 2021]
- Sunday, 25th May 1913 Frank the Guilty Man, Declares Chief Lanford [Last Updated On: February 20th, 2023] [Originally Added On: September 22nd, 2021]
- Sunday, 25th May 1913 Here Is the Dictagraph Record of Woodwards Conversation [Last Updated On: February 20th, 2023] [Originally Added On: September 15th, 2021]
- Sunday, 25th May 1913 Knew It Was Coming, Declares Cole Blease [Last Updated On: February 20th, 2023] [Originally Added On: September 23rd, 2021]
- Sunday, 25th May 1913 Others Will Be Involved In New Bribery Charges Intimates Chief Lanford [Last Updated On: May 9th, 2023] [Originally Added On: September 20th, 2021]
- Sunday, 25th May 1913 Police Chairman Confident of Honesty of Officials [Last Updated On: May 9th, 2023] [Originally Added On: September 25th, 2021]
- Sunday, 25th May 1913 Says Chief is Able to Care for Himself [Last Updated On: May 9th, 2023] [Originally Added On: September 24th, 2021]
- Sunday, 25th May 1913 Thomas Felder Brands the Charges of Bribery Diabolical Conspiracy [Last Updated On: February 20th, 2023] [Originally Added On: September 13th, 2021]
- Monday, 26th May 1913 Frank is Guilty, Says Pinkerton [Last Updated On: April 21st, 2023] [Originally Added On: September 11th, 2021]
- Monday, 26th May 1913 New Witnesses in Phagan Case Found by Police [Last Updated On: April 21st, 2023] [Originally Added On: September 12th, 2021]
- Monday, 26th May 1913 Thousands in Atlanta Living the Life of Mary Phagans MurdererRev. W. W. Memminger [Last Updated On: April 21st, 2023] [Originally Added On: September 10th, 2021]
- Tuesday, 27th May 1913 Burns Agency Quits the Phagan Case; Tobie Leaves Today [Last Updated On: April 21st, 2023] [Originally Added On: September 9th, 2021]
- Tuesday, 27th May 1913 Chief James L. Beavers Reply to Mayor Woodward [Last Updated On: April 21st, 2023] [Originally Added On: September 8th, 2021]
- Wednesday, 28th May 1913 Conley Reported to Admit Writing Notes Saturday [Last Updated On: April 21st, 2023] [Originally Added On: September 7th, 2021]
- Thursday, 29th May 1913 Negro Sweeper Tells the Story of Murder Notes [Last Updated On: April 26th, 2023] [Originally Added On: September 6th, 2021]
- Friday, 30th May 1913 But One Thing is Proved in Mary Phagan Mystery [Last Updated On: April 26th, 2023] [Originally Added On: September 4th, 2021]
- Friday, 30th May 1913 Conley Says He Helped Frank Carry Body of Mary Phagan to Pencil Factory Cellar [Last Updated On: April 26th, 2023] [Originally Added On: September 5th, 2021]
- Saturday, 31st May 1913 Conley Tells Graphic Story of Disposal of the Dead Body [Last Updated On: April 26th, 2023] [Originally Added On: September 2nd, 2021]
- Saturday, 31st May 1913 Mary Phagans Murder Was Work of a Negro Declares Leo M. Frank [Last Updated On: April 26th, 2023] [Originally Added On: September 3rd, 2021]
- Sunday, 1st June 1913 Conley is Removed from Fulton Tower at His Own Request [Last Updated On: May 4th, 2023] [Originally Added On: September 1st, 2021]
- Monday, 2nd June 1913 Frank Asked Room to Conceal Body Believes Lanford [Last Updated On: May 4th, 2023] [Originally Added On: August 31st, 2021]
- Tuesday, 3rd June 1913 Grand Jury Calls for Thos. Felder and Police Heads [Last Updated On: May 4th, 2023] [Originally Added On: August 30th, 2021]
- Tuesday, 3rd June 1913 Leo Franks Cook Put Under Arrest [Last Updated On: May 4th, 2023] [Originally Added On: August 29th, 2021]
- Wednesday, 4th June 1913 Servant of Frank is Liberated After Long Examination [Last Updated On: May 4th, 2023] [Originally Added On: August 27th, 2021]
- Wednesday, 4th June 1913 Vice List Wanted by Chief Beavers; Promises Probe [Last Updated On: May 4th, 2023] [Originally Added On: August 28th, 2021]
- Thursday, 5th June 1913 Frank Wanted Gun to Take His Life, Says Negro Cook [Last Updated On: May 4th, 2023] [Originally Added On: August 26th, 2021]
- Thursday, 5th June 1913 Jury Will Probe Dictagraph Row [Last Updated On: May 4th, 2023] [Originally Added On: August 25th, 2021]
- Friday, 6th June 1913 Dorsey Replies to the Charges of Mrs. L. Frank [Last Updated On: May 4th, 2023] [Originally Added On: August 24th, 2021]
- Friday, 6th June 1913 Felder and Lanford Come Near to Blows [Last Updated On: May 4th, 2023] [Originally Added On: August 21st, 2021]
- Friday, 6th June 1913 Grand Jury May Drop Vice Probe [Last Updated On: May 9th, 2023] [Originally Added On: August 23rd, 2021]
- Friday, 6th June 1913 Grand Jury Probes Detective Leaks [Last Updated On: May 9th, 2023] [Originally Added On: August 22nd, 2021]
- Saturday, 7th June 1913 Current in Effect on Day of Tragedy [Last Updated On: May 9th, 2023] [Originally Added On: August 19th, 2021]
- Saturday, 7th June 1913 Lanford Claps Lid on Detective News [Last Updated On: May 9th, 2023] [Originally Added On: August 20th, 2021]
- Sunday, 8th June 1913 Felder Makes Answer to Dictagraph Episode [Last Updated On: May 9th, 2023] [Originally Added On: August 18th, 2021]
- Sunday, 8th June 1913 Lanford Answers Felder’s Charge [Last Updated On: May 9th, 2023] [Originally Added On: August 17th, 2021]
- Tuesday, 10th June 1913 Leo Frank Reported Ready for His Trial [Last Updated On: May 9th, 2023] [Originally Added On: August 16th, 2021]
- Wednesday, 11th June 1913 Dictograph Records Crooked, Says Gentry [Last Updated On: May 9th, 2023] [Originally Added On: August 15th, 2021]
- Wednesday, 11th June 1913 Lanford Silent on Rosser’s Card [Last Updated On: May 9th, 2023] [Originally Added On: August 14th, 2021]
- Thursday, 12th June 1913 Grand Jury Will Probe Affidavits About Dictagraph [Last Updated On: May 9th, 2023] [Originally Added On: August 13th, 2021]
- Friday, 13th June 1913 Beavers Trying to Find Gentry [Last Updated On: May 9th, 2023] [Originally Added On: August 12th, 2021]
- Friday, 13th June 1913 Negro Conley May Face Frank Today [Last Updated On: May 9th, 2023] [Originally Added On: August 11th, 2021]
- Saturday, 14th June 1913 Col. Felder Asks Early Jury Probe [Last Updated On: May 9th, 2023] [Originally Added On: August 9th, 2021]
- Saturday, 14th June 1913 Conley Released, Then Rearrested [Last Updated On: May 9th, 2023] [Originally Added On: August 10th, 2021]
- Sunday, 15th June 1913 Detective Chief Tells Grand Jury of “Third Degree” [Last Updated On: May 9th, 2023] [Originally Added On: August 8th, 2021]
- Sunday, 15th June 1913 Frank Hooper Aids Phagan Prosecution [Last Updated On: May 18th, 2023] [Originally Added On: August 7th, 2021]
- Sunday, 15th June 1913 Solicitor Dorsey Goes to New York [Last Updated On: May 18th, 2023] [Originally Added On: August 6th, 2021]
- Monday, 16th June 1913 Col. Thomas Felder Goes to Cincinnati [Last Updated On: May 18th, 2023] [Originally Added On: August 5th, 2021]
- Monday, 16th June 1913 Constitution Picture Will Figure in Trial [Last Updated On: May 18th, 2023] [Originally Added On: August 4th, 2021]
- Wednesday, 18th June 1913 Two New Witnesses Sought by Officers [Last Updated On: May 18th, 2023] [Originally Added On: August 3rd, 2021]
- Thursday, 19th June 1913 Mrs. Formby Here for Phagan Trial [Last Updated On: May 18th, 2023] [Originally Added On: August 2nd, 2021]
- Thursday, 19th June 1913 Reuben Arnold May Aid Frank’s Defense In Big Murder Trial [Last Updated On: May 18th, 2023] [Originally Added On: August 1st, 2021]
- Friday, 20th June 1913 Formby Woman May Not Be A Witness [Last Updated On: May 18th, 2023] [Originally Added On: July 31st, 2021]
- Saturday, 21st June 1913 Postponement Likely In Leo Frank’s Trial [Last Updated On: May 18th, 2023] [Originally Added On: July 30th, 2021]
- Sunday, 22nd June 1913 Col. Felder Returns From Trip to Ohio [Last Updated On: May 18th, 2023] [Originally Added On: July 28th, 2021]
- Sunday, 22nd June 1913 Frank Not Guilty of Phagan Murder Declares Arnold [Last Updated On: May 18th, 2023] [Originally Added On: July 29th, 2021]
- Sunday, 22nd June 1913 Leading Law Firms Have Joined Forces [Last Updated On: May 18th, 2023] [Originally Added On: July 27th, 2021]
- Monday, 23rd June 1913 Leo M. Frank’s Trial June 30, Says Dorsey [Last Updated On: March 6th, 2024] [Originally Added On: July 26th, 2021]
- Tuesday, 24th June 1913 Frank’s Trial Set For Next Monday [Last Updated On: May 18th, 2023] [Originally Added On: July 25th, 2021]
- Wednesday, 25th June 1913 Reported Hoke Smith May Aid Leo Frank [Last Updated On: May 18th, 2023] [Originally Added On: July 24th, 2021]
- Wednesday, 25th June 1913 Trial of Leo Frank Postponed by Judge [Last Updated On: May 18th, 2023] [Originally Added On: July 23rd, 2021]
- Saturday, 28th June 1913 Lanford and Felder Indicted for Libel [Last Updated On: May 18th, 2023] [Originally Added On: July 22nd, 2021]
- Friday, 4th July 1913 Effort Will Be Made to Free Newt Lee [Last Updated On: May 18th, 2023] [Originally Added On: July 20th, 2021]
- Wednesday, 9th July 1913 Caught Drinking, Three Policemen Fired Off Force [Last Updated On: May 18th, 2023] [Originally Added On: July 19th, 2021]
- Wednesday, 9th July 1913 Vice Scandal Probe Postponed for a Day [Last Updated On: May 18th, 2023] [Originally Added On: July 18th, 2021]
- Thursday, 10th July 1913 Hotels Involved By Story of Vice Young Girl Tells [Last Updated On: May 18th, 2023] [Originally Added On: July 17th, 2021]
- Thursday, 10th July 1913 Mary Phagan’s Pay Envelope is Found [Last Updated On: May 18th, 2023] [Originally Added On: July 16th, 2021]
- Friday, 11th July 1913 Conley Not Right Man, Says Mincey [Last Updated On: May 18th, 2023] [Originally Added On: July 15th, 2021]
- Sunday, 13th July 1913 Detective Harry Scott’s Hunch Thrilling Story of How it Secured James Conley’s Confession [Last Updated On: May 18th, 2023] [Originally Added On: July 12th, 2021]
- Sunday, 13th July 1913 Former Story True, Says Negro Sweeper [Last Updated On: May 18th, 2023] [Originally Added On: July 14th, 2021]
- Sunday, 13th July 1913 Lee Must Remain Behind the Bars [Last Updated On: May 18th, 2023] [Originally Added On: July 13th, 2021]
- Sunday, 13th July 1913 Parents Are Blamed for Daughters’ Fall [Last Updated On: May 18th, 2023] [Originally Added On: July 11th, 2021]
- Wednesday, 16th July 1913 No New Indictment Says Jury Foreman [Last Updated On: May 18th, 2023] [Originally Added On: July 10th, 2021]
- Friday, 18th July 1913 Many Rumors Afloat Regarding Grand Jury [Last Updated On: May 18th, 2023] [Originally Added On: July 8th, 2021]
- Friday, 18th July 1913 Wordy War Over, Says Woodward [Last Updated On: May 18th, 2023] [Originally Added On: July 9th, 2021]
- Saturday, 19th July 1913 Grand Jury Meets to Indict Conley [Last Updated On: May 18th, 2023] [Originally Added On: July 6th, 2021]
- Saturday, 19th July 1913 Scott Believes Conley Innocent, Asserts Lanford [Last Updated On: May 18th, 2023] [Originally Added On: July 7th, 2021]
- Saturday, 19th July 1913 Woodward Uses Clemency Again [Last Updated On: May 18th, 2023] [Originally Added On: July 5th, 2021]
- Sunday, 20th July 1913 Frank's Lawyers Score Dorsey For His Stand [Last Updated On: April 28th, 2024] [Originally Added On: March 31st, 2024]
- Sunday, 20th July 1913 Frank’s Lawyers Score Dorsey for His Stand [Last Updated On: March 4th, 2024] [Originally Added On: July 4th, 2021]
- Sunday, 20th July 1913 Grim Justice Pursues Mary Phagan’s Slayer [Last Updated On: March 4th, 2024] [Originally Added On: July 2nd, 2021]
- Sunday, 20th July 1913 Mrs. Nina Formby Will Not Return for Trial [Last Updated On: March 4th, 2024] [Originally Added On: July 3rd, 2021]
- Sunday, 20th July 1913 Prison System of Georgia Attacked by Episcopalians [Last Updated On: March 4th, 2024] [Originally Added On: July 1st, 2021]
- Tuesday, 22nd July 1913 Date Of Frank Trial Depends On Weather [Last Updated On: April 28th, 2024] [Originally Added On: March 31st, 2024]
- Wednesday, 23rd July 1913 Bloody Club Lends New Clue to Mystery [Last Updated On: March 6th, 2024] [Originally Added On: June 28th, 2021]
- Wednesday, 23rd July 1913 Give Right of Way to Case of Frank [Last Updated On: March 6th, 2024] [Originally Added On: June 29th, 2021]
- Wednesday, 23rd July 1913 Mayor May Hold Up Dictagraph Warrant [Last Updated On: April 28th, 2024] [Originally Added On: March 8th, 2024]
- Thursday, 24th July 1913 Conley and Lee Meet in Tower [Last Updated On: May 18th, 2023] [Originally Added On: June 27th, 2021]
- Thursday, 24th July 1913 Is It Lady-like To Look Like A Lady On Atlanta's Streets? [Last Updated On: April 28th, 2024] [Originally Added On: March 31st, 2024]
- Thursday, 24th July 1913 Phagan Mystery Club Examined by Experts [Last Updated On: June 4th, 2023] [Originally Added On: June 26th, 2021]
- Friday, 25th July 1913 Chiefs Will Probe Removal of Conley [Last Updated On: April 4th, 2024] [Originally Added On: June 24th, 2021]
- Friday, 25th July 1913 Try to Corroborate Story Told by Conley [Last Updated On: April 4th, 2024] [Originally Added On: June 22nd, 2021]
- Friday, July 25th, 1913, Veniremen Drawn for Leo Frank Trial, The Atlanta Constitution [Last Updated On: May 5th, 2024] [Originally Added On: June 25th, 2021]
- Friday, July 25th, 1913, Work on Mary Phagan Case Brings Promotion to Pinkerton Man, Atlanta Constitution. [Last Updated On: May 5th, 2024] [Originally Added On: June 23rd, 2021]
- Saturday, 26th July 1913 Frank’s Lawyers Ready for Trial [Last Updated On: June 4th, 2023] [Originally Added On: June 21st, 2021]
- Sunday, 27th July 1913 All in Readiness for Frank’s Trial Monday Morning [Last Updated On: June 4th, 2023] [Originally Added On: June 30th, 2021]
- Monday, 28th July 1913 Jurors in Leo M. Frank Case Must Answer Four Questions [Last Updated On: March 6th, 2024] [Originally Added On: June 19th, 2021]
- Monday, 28th July 1913 Leo Frank’s Trial on Murder Charge Booked for Today [Last Updated On: March 6th, 2024] [Originally Added On: June 20th, 2021]
- Tuesday, 29th July 1913 96 Men are Called Before Getting Jury, The Atlanta Constitution [Last Updated On: March 14th, 2024] [Originally Added On: June 14th, 2021]
- Tuesday, 29th July 1913 Burglars Try to Enter Home of Frank Juror, The Atlanta Constitution [Last Updated On: March 14th, 2024] [Originally Added On: June 17th, 2021]
- Tuesday, July 29th, 1913: Mincey, on Arrival Reaffirms Affidavit, The Atlanta Constitution [Last Updated On: March 14th, 2024] [Originally Added On: June 16th, 2021]
- Tuesday, 29th July 1913 Numerous Witnesses Called in Frank Case, The Atlanta Constitution [Last Updated On: March 10th, 2024] [Originally Added On: June 15th, 2021]
- Tuesday, 29th July 1913 Reporter Witnesses are Allowed in Court, The Atlanta Constitution [Last Updated On: March 10th, 2024] [Originally Added On: June 13th, 2021]
- Tuesday, 29th July 1913 Trial of Leo M. Frank on Charge of Murder Begins; Mrs. Coleman, George Epps and Newt Lee on Stand, The Atlanta Constitution [Last Updated On: March 14th, 2024] [Originally Added On: June 18th, 2021]
- Tuesday, 29th July 1913 Unusual Interest Centers In Mrs. Frank’s Appearance, The Atlanta Constitution [Last Updated On: March 10th, 2024] [Originally Added On: June 12th, 2021]
- Tuesday, 29th July 1913 Watchman Tells Of Finding Body Of Mary Phagan [Last Updated On: April 28th, 2024] [Originally Added On: March 22nd, 2024]
- Tuesday, 29th July 1913 Will Leo Frank’s Lawyers Put Any Evidence Before the Jury? The Atlanta Constitution [Last Updated On: March 10th, 2024] [Originally Added On: June 11th, 2021]
- Wednesday, 30th July 1913 Clash Comes Over Evidence Of Detective John Starnes [Last Updated On: June 4th, 2023] [Originally Added On: June 8th, 2021]
- Wednesday, 30th July 1913 First Two Days of Frank Trial Only Skirmishes Before Battle [Last Updated On: June 4th, 2023] [Originally Added On: June 4th, 2021]
- Wednesday, 30th July 1913 Lee, Dull and Ignorant, Calm Under Gruelling Cross Fire [Last Updated On: February 20th, 2023] [Originally Added On: June 9th, 2021]
- Wednesday, 30th July 1913 Mother and Daughter in Tears As Clothing of Mary Phagan Is Exhibited in Courtroom [Last Updated On: June 4th, 2023] [Originally Added On: June 5th, 2021]
- Wednesday, 30th July 1913 Officer Tells About Discovery Of Body of Girl in Basement [Last Updated On: June 4th, 2023] [Originally Added On: June 6th, 2021]
- Wednesday, 30th July 1913 Sergeant Dobbs Resumes Stand At Tuesday Afternoon Session [Last Updated On: June 4th, 2023] [Originally Added On: June 7th, 2021]
- Wednesday, 30th July 1913 Three Witnesses Describe Finding Mary Phagan’s Body [Last Updated On: June 4th, 2023] [Originally Added On: June 10th, 2021]
- Thursday, 31st July 1913 Bearing of Black and Lee Forms a Study in Contrast [Last Updated On: June 4th, 2023] [Originally Added On: May 27th, 2021]
- Thursday, 31st July 1913 Daintily Dressed Girl Tells Of Daily Routine of Factory [Last Updated On: June 4th, 2023] [Originally Added On: May 30th, 2021]
- Thursday, 31st July 1913 Defense Riddles John Black’s Testimony [Last Updated On: June 4th, 2023] [Originally Added On: June 3rd, 2021]
- Thursday, 31st July 1913 Detective Black Muddled By Keen Cross-Examination Of Attorneys for Defense [Last Updated On: June 4th, 2023] [Originally Added On: June 2nd, 2021]
- Thursday, 31st July 1913 Idle and Curious Throng Court Despite Big Force of Deputies [Last Updated On: June 4th, 2023] [Originally Added On: May 31st, 2021]
- Thursday, 31st July 1913 Mrs. Coleman Is Recalled To Identify Mary’s Handbag [Last Updated On: June 4th, 2023] [Originally Added On: June 1st, 2021]
- Thursday, 31st July 1913 Photo By Francis E Price, Staff Photographer. [Last Updated On: April 28th, 2024] [Originally Added On: March 31st, 2024]
- Thursday, 31st July 1913 Rogers on Stand Describes Visit of Frank to Undertakers [Last Updated On: June 4th, 2023] [Originally Added On: May 29th, 2021]
- Thursday, 31st July 1913 William Gheesling First Witness Today [Last Updated On: June 4th, 2023] [Originally Added On: May 26th, 2021]
- Friday, 1st August 1913 Acquitted In The Same Court, She Believers Is Innocent [Last Updated On: April 28th, 2024] [Originally Added On: March 22nd, 2024]
- Friday, 1st August 1913 Attorneys for Both Sides Riled by Scott’s Testimony; Replies Cause Lively Tilts [Last Updated On: June 4th, 2023] [Originally Added On: May 25th, 2021]
- Friday, 1st August 1913 Blood Found by Dr. Smith on Chips and Lee’s Shirt [Last Updated On: June 4th, 2023] [Originally Added On: May 17th, 2021]
- Friday, 1st August 1913 E. F. Holloway Testimony [Last Updated On: June 4th, 2023] [Originally Added On: May 21st, 2021]
- Friday, 1st August 1913 Finding of Hair and Envelope Described by Factory Machinist [Last Updated On: June 4th, 2023] [Originally Added On: May 20th, 2021]
- Friday, 1st August 1913 Frank’s Presence in Office at Time He Says He Was There is Denied by Girl on Stand [Last Updated On: June 4th, 2023] [Originally Added On: May 22nd, 2021]
- Friday, 1st August 1913 Haslett Describes Visit to Home of Leo Frank [Last Updated On: June 4th, 2023] [Originally Added On: May 19th, 2021]
- Friday, 1st August 1913 Holloway Denies Affidavit He Signed for Solicitor [Last Updated On: June 4th, 2023] [Originally Added On: May 24th, 2021]
- Friday, 1st August 1913 Leo Frank Innocent, Says Mrs. Appelbaum [Last Updated On: June 11th, 2023] [Originally Added On: May 18th, 2021]
- Friday, 1st August 1913 Mrs. Arthur White Takes Stand Today [Last Updated On: June 11th, 2023] [Originally Added On: May 15th, 2021]
- Friday, 1st August 1913 Sweeper Swears No Spots Were on Floor Day Before Murder [Last Updated On: June 11th, 2023] [Originally Added On: May 16th, 2021]
- Friday, 1st August 1913 William Gheesling, Embalmer, Tells of Wounds on Girl’s Body [Last Updated On: June 11th, 2023] [Originally Added On: May 23rd, 2021]
- Saturday, 2nd August 1913 Frequent and Angry Clashes Between Attorneys Mark the Hearing of Darley’s Testimony [Last Updated On: June 11th, 2023] [Originally Added On: May 13th, 2021]
- Saturday, 2nd August 1913 Gay Febuary Tells Frank Jury About Statement Prisoner Made [Last Updated On: June 11th, 2023] [Originally Added On: May 6th, 2021]
- Saturday, 2nd August 1913 Husband of Minola McKnight Describes Movements of Frank [Last Updated On: June 11th, 2023] [Originally Added On: May 9th, 2021]
- Saturday, 2nd August 1913 Mary Phagan Murdered Within Hour After Dinner [Last Updated On: June 11th, 2023] [Originally Added On: May 14th, 2021]
- Saturday, 2nd August 1913 Negro Lurking in Factory Seen by Wife of Employee [Last Updated On: June 11th, 2023] [Originally Added On: May 11th, 2021]
- Saturday, 2nd August 1913 Policeman W. F. Anderson Tells of Newt Lee’s Telephone Call [Last Updated On: June 11th, 2023] [Originally Added On: May 10th, 2021]
- Saturday, 2nd August 1913 Startling Statements Made During Testimony of Dr. Harris [Last Updated On: June 11th, 2023] [Originally Added On: May 12th, 2021]
- Saturday, 2nd August 1913 Stenographer Parry Identifies Notes Taken at Phagan Inquest [Last Updated On: June 11th, 2023] [Originally Added On: May 8th, 2021]
- Saturday, 2nd August 1913 Witnesses Called To Stand To Testify Against Frank [Last Updated On: April 28th, 2024] [Originally Added On: March 13th, 2024]
- Saturday, 2nd August 1913 Women and Girls Thronging Court for Trial of Leo Frank [Last Updated On: June 11th, 2023] [Originally Added On: May 7th, 2021]
- Sunday, 3rd August 1913 Break in the Frank Trial May Come With the Hearing Of Jim Conley’s Testimony [Last Updated On: June 11th, 2023] [Originally Added On: May 2nd, 2021]
- Sunday, 3rd August 1913 Chief Beavers Tells of Seeing Blood Spots on Factory Floor [Last Updated On: June 11th, 2023] [Originally Added On: April 26th, 2021]
- Sunday, 3rd August 1913 Condition of Girl’s Body Described by Dr. J. W. Hurt [Last Updated On: June 11th, 2023] [Originally Added On: May 3rd, 2021]
- Sunday, 3rd August 1913 Detective Waggoner Describes Extreme Nervousness of Frank [Last Updated On: June 11th, 2023] [Originally Added On: May 1st, 2021]
- Sunday, 3rd August 1913 Dorsey Pleased With Progress [Last Updated On: June 11th, 2023] [Originally Added On: April 25th, 2021]
- Sunday, 3rd August 1913 Finding of Dead Girl’s Parasol is Told by Policeman Lasseter [Last Updated On: June 11th, 2023] [Originally Added On: April 29th, 2021]
- Sunday, 3rd August 1913 Fixing Hour of Girl’s Death Through Aid of Modern Science The Prosecution’s Greatest Aid [Last Updated On: June 11th, 2023] [Originally Added On: April 30th, 2021]
- Sunday, 3rd August 1913 Girl Asked for Mary Phagan’s Pay But Was Refused by Frank [Last Updated On: June 11th, 2023] [Originally Added On: April 28th, 2021]
- Sunday, 3rd August 1913 Good Order Kept in Court by Vigilance of Deputies [Last Updated On: June 11th, 2023] [Originally Added On: April 27th, 2021]
- Sunday, 3rd August 1913 Mistrial Near When Jury Saw a Newspaper in Judge’s Hands [Last Updated On: June 11th, 2023] [Originally Added On: May 5th, 2021]
- Sunday, 3rd August 1913 Resume of Week’s Evidence Shows Little Progress Made [Last Updated On: June 11th, 2023] [Originally Added On: May 4th, 2021]
- Monday, 4th August 1913 Dr. H. F. Harris Will Take Stand This Afternoon [Last Updated On: September 12th, 2023] [Originally Added On: April 23rd, 2021]
- Monday, 4th August 1913 Every Man on Franks Jury Gets Nickname for Trial [Last Updated On: June 11th, 2023] [Originally Added On: April 22nd, 2021]
- Monday, 4th August 1913 Frank on Stand Wednesday Week [Last Updated On: June 11th, 2023] [Originally Added On: April 24th, 2021]
- Monday, 4th August 1913 Leo Franks Trial Is Attracting Universal Interest in Georgia [Last Updated On: June 11th, 2023] [Originally Added On: April 21st, 2021]
- Monday, 4th August 1913 Their Testimony Is Important In The Trial Of Leo M. Frank [Last Updated On: April 28th, 2024] [Originally Added On: March 22nd, 2024]
- Tuesday, 5th August 1913 Amazing Testimony of Conley Marks Crucial Point of Trial; Says Frank Admitted Crime [Last Updated On: June 11th, 2023] [Originally Added On: April 19th, 2021]
- Tuesday, 5th August 1913 Conley Grilled Five Hours By Luther Rosser [Last Updated On: June 11th, 2023] [Originally Added On: April 20th, 2021]
- Tuesday, 5th August 1913 Conley Is Mercilessly Grilled At Afternoon Session of Court [Last Updated On: June 11th, 2023] [Originally Added On: April 18th, 2021]
- Tuesday, 5th August 1913 Flashlight in The Constitution Introduced in Trial of Frank [Last Updated On: June 11th, 2023] [Originally Added On: April 17th, 2021]
- Tuesday, 5th August 1913 Frank Very Nervous, Testifies L. O. Grice [Last Updated On: June 11th, 2023] [Originally Added On: April 13th, 2021]
- Tuesday, 5th August 1913 Handsome Woman Seeks in Vain For Witness at Franks Trial [Last Updated On: June 11th, 2023] [Originally Added On: April 14th, 2021]
- Tuesday, 5th August 1913 Scenes In Courtroom Monday While Conley Was On Stand [Last Updated On: April 28th, 2024] [Originally Added On: March 22nd, 2024]
- Tuesday, 5th August 1913 Stanford Recalled By Solicitor Dorsey [Last Updated On: June 11th, 2023] [Originally Added On: April 12th, 2021]
- Tuesday, 5th August 1913 Witnesses in Franks Trial In Role of Marriage Witnesses [Last Updated On: June 11th, 2023] [Originally Added On: April 16th, 2021]
- Tuesday, 5th August 1913 Women of Every Class and Age Listen With Morbid Curiosity To Testimony of Negro Conley [Last Updated On: June 11th, 2023] [Originally Added On: April 15th, 2021]
- Wednesday, 6th August 1913 Conley Remains Calm Under Grilling Cross-Examination [Last Updated On: June 11th, 2023] [Originally Added On: April 10th, 2021]
- Wednesday, 6th August 1913 Conleys Main Story Still Remains Unshaken [Last Updated On: June 11th, 2023] [Originally Added On: April 11th, 2021]
- Wednesday, 6th August 1913 Defense Asks Judge Roan to Strike From Records Part of Conley Testimony [Last Updated On: June 11th, 2023] [Originally Added On: April 8th, 2021]
- Wednesday, 6th August 1913 Ignorance of Negro Witnesses Helps Them When on the Stand [Last Updated On: June 12th, 2023] [Originally Added On: April 7th, 2021]
- Wednesday, 6th August 1913 Mincey Affidavit Is Denied By Conley During Afternoon [Last Updated On: June 12th, 2023] [Originally Added On: April 9th, 2021]
- Wednesday, 6th August 1913 Women Are Playing Big Part In Trial Of Frank [Last Updated On: April 28th, 2024] [Originally Added On: March 22nd, 2024]
- Thursday, 7th August 1913 Applause Sweeps Courtroom When Dorsey Scores a Point [Last Updated On: June 12th, 2023] [Originally Added On: April 2nd, 2021]
- Thursday, 7th August 1913 Because He is Patriotic Mincey is Here for Trial [Last Updated On: June 12th, 2023] [Originally Added On: April 1st, 2021]
- Thursday, 7th August 1913 Hugh Dorsey Wins His Spurs; Crowd Recognizes Gameness [Last Updated On: June 12th, 2023] [Originally Added On: March 30th, 2021]
- Thursday, 7th August 1913 Judges Decision Admits Conley Testimony in Full [Last Updated On: June 12th, 2023] [Originally Added On: March 31st, 2021]
- Thursday, 7th August 1913 Mary Phagan Was Strangled Declares Dr. H. F. Harris [Last Updated On: June 12th, 2023] [Originally Added On: April 4th, 2021]
- Thursday, 7th August 1913 Mrs. Coleman Tells of Cooking Cabbage for Dr. H. F. Harris [Last Updated On: June 12th, 2023] [Originally Added On: April 3rd, 2021]
- Thursday, 7th August 1913 Spontaneous Applause Greets Dorseys Victory [Last Updated On: June 12th, 2023] [Originally Added On: April 6th, 2021]
- Thursday, 7th August 1913 Their Testimony Will Have Direct Bearing On Leo Frank's Case [Last Updated On: April 28th, 2024] [Originally Added On: March 31st, 2024]
- Thursday, 7th August 1913 Unable to Shake Conleys Story Rosser Ends Cross-Examination [Last Updated On: June 12th, 2023] [Originally Added On: April 5th, 2021]
- Thursday, 7th August 1913 While Murder Trial Goes on Witnesses While Away Time With Old Camp Meeting Songs [Last Updated On: June 12th, 2023] [Originally Added On: March 29th, 2021]
- Friday, 8th August 1913 Dalton Corroborates Statements Contained in Conleys Testimony [Last Updated On: June 12th, 2023] [Originally Added On: March 28th, 2021]
- Friday, 8th August 1913 Defense May Call for Character Witnesses Today [Last Updated On: June 12th, 2023] [Originally Added On: March 24th, 2021]
- Friday, 8th August 1913 Dorsey Forces Childs to Admit Certain Portions of His Testimony Could Not Be Considered Expert [Last Updated On: June 12th, 2023] [Originally Added On: March 27th, 2021]
- Friday, 8th August 1913 Dr. Childs Differs with Harris As to Processes of Digestion [Last Updated On: June 12th, 2023] [Originally Added On: March 26th, 2021]
- Friday, 8th August 1913 Dr. Frank Eskridge Aiding Prosecution [Last Updated On: June 12th, 2023] [Originally Added On: March 23rd, 2021]
- Friday, 8th August 1913 Harris Sticks to Testimony As to Time of Girls Death [Last Updated On: June 12th, 2023] [Originally Added On: March 22nd, 2021]
- Friday, 8th August 1913 Rosser Swears Bludgeon Was Not In Factory Day After the Murder [Last Updated On: June 12th, 2023] [Originally Added On: March 20th, 2021]
- Friday, 8th August 1913 Scott Called by Defense To Refute Conleys Story [Last Updated On: June 12th, 2023] [Originally Added On: March 25th, 2021]
- Friday, 8th August 1913 Will Defense Put Character of Leo Frank Before Jury? [Last Updated On: June 12th, 2023] [Originally Added On: March 21st, 2021]
- Saturday, 9th August 1913 Civil Engineer and Photographer Tell of Making Plats and Photos [Last Updated On: June 12th, 2023] [Originally Added On: March 13th, 2021]
- Saturday, 9th August 1913 Conductor Also Swears Epps Boy Was Not on Car With Mary Phagan [Last Updated On: June 12th, 2023] [Originally Added On: March 16th, 2021]
- Saturday, 9th August 1913 Couldnt Locate Epps Boy When Wanted in Court [Last Updated On: June 12th, 2023] [Originally Added On: March 18th, 2021]
- Saturday, 9th August 1913 Defense Will Seek to Show That Mary Phagans Body Was Tossed Down a Chute in Rear of Pencil Factory And Not Taken Down by Elevator As the State Insists [Last Updated On: June 12th, 2023] [Originally Added On: March 19th, 2021]
- Saturday, 9th August 1913 Epps Boy Not With Mary Phagan, Declares Street Car Motorman [Last Updated On: June 12th, 2023] [Originally Added On: March 10th, 2021]
- Saturday, 9th August 1913 Harry Scott and Boots Rogers Recalled to Stand by the State [Last Updated On: June 12th, 2023] [Originally Added On: March 12th, 2021]
- Saturday, 9th August 1913 Hinchey Tells of Seeing Frank on Car on Day of the Murder [Last Updated On: June 12th, 2023] [Originally Added On: March 11th, 2021]
- Saturday, 9th August 1913 Holloway, Witness for Defense, Riddled By Cross-Examination [Last Updated On: June 12th, 2023] [Originally Added On: March 17th, 2021]
- Saturday, 9th August 1913 Hopkins Woman Denies Charges Made By Dalton and Jim Conley; Is Forced to Admit Untruths [Last Updated On: June 12th, 2023] [Originally Added On: March 14th, 2021]
- Saturday, 9th August 1913 N. V. Darley Denies Testimony Given by Conley and Dalton [Last Updated On: June 12th, 2023] [Originally Added On: March 15th, 2021]
- Saturday, 9th August 1913 Witness Admits Discrepancies in Model of Pencil Factory [Last Updated On: June 12th, 2023] [Originally Added On: March 9th, 2021]
- Sunday, 10th August 1913 Defense Will Renew Attack Upon Dr. Harris Testimony [Last Updated On: June 12th, 2023] [Originally Added On: March 6th, 2021]
- Sunday, 10th August 1913 Epps Boy Denies Trying to Avoid Being Called to the Stand Again [Last Updated On: June 12th, 2023] [Originally Added On: March 5th, 2021]
- Sunday, 10th August 1913 Frank A. Hooper Is Proving Big Aid to Solicitor Dorsey [Last Updated On: June 12th, 2023] [Originally Added On: March 3rd, 2021]
- Sunday, 10th August 1913 Introduction by Defense of Host Of Character Witnesses Probable [Last Updated On: June 12th, 2023] [Originally Added On: March 4th, 2021]
- Sunday, 10th August 1913 Is Defense Planning Telling Blow At Testimony Given by Jim Conley? [Last Updated On: June 12th, 2023] [Originally Added On: March 1st, 2021]
- Sunday, 10th August 1913 Reporter Makes Denial of Charge That Reports Have Been Flavored [Last Updated On: June 12th, 2023] [Originally Added On: February 28th, 2021]
- Sunday, 10th August 1913 Schiff Put on Stand to Refute Conley and Dalton Testimony [Last Updated On: June 12th, 2023] [Originally Added On: March 7th, 2021]
- Sunday, 10th August 1913 Schiff Testimony Contradicts That Given by Dalton and Negro Conley [Last Updated On: June 12th, 2023] [Originally Added On: March 8th, 2021]
- Sunday, 10th August 1913 Startling Testimony of Conley Feature of Trials Second Week [Last Updated On: June 12th, 2023] [Originally Added On: March 2nd, 2021]
- Monday, 11th August 1913 Jurors Have a Great Time Playing Jokes on Deputies [Last Updated On: June 13th, 2023] [Originally Added On: February 26th, 2021]
- Monday, 11th August 1913 Murder Evidence May Be Concluded by Next Saturday [Last Updated On: June 13th, 2023] [Originally Added On: February 27th, 2021]
- Tuesday, 12th August 1913 As the Very Wildest of Guessing Dr. Westmoreland Characterizes Testimony Given by Dr. Harris [Last Updated On: June 13th, 2023] [Originally Added On: February 20th, 2021]
- Tuesday, 12th August 1913 Defense Has Best Day Since Trial of Frank Began [Last Updated On: June 13th, 2023] [Originally Added On: February 25th, 2021]
- Tuesday, 12th August 1913 Dr. Hancock Called by Defense, Assails Dr. Harris Testimony [Last Updated On: June 13th, 2023] [Originally Added On: February 21st, 2021]
- Tuesday, 12th August 1913 Expert Flatly Contradicts The Testimony of Dr. Harris [Last Updated On: June 13th, 2023] [Originally Added On: February 24th, 2021]
- Tuesday, 12th August 1913 Franks Financial Sheet Would Take 3 Hours Work to Finish Joel Hunter [Last Updated On: June 13th, 2023] [Originally Added On: February 19th, 2021]
- Tuesday, 12th August 1913 Guesswork and Not Science Asserts Dr. J. C. Olmstead [Last Updated On: June 13th, 2023] [Originally Added On: February 22nd, 2021]
- Tuesday, 12th August 1913 Schiff Admits He Kept Conley Knowing He Was Worthless [Last Updated On: June 13th, 2023] [Originally Added On: February 23rd, 2021]
- Wednesday, 13th August 1913 Many Witnesses Take the Stand to Refute Points of Prosecution [Last Updated On: June 13th, 2023] [Originally Added On: February 18th, 2021]
- Thursday, 14th August 1913 Bitter Fight at Morning Session Over Testimony of Dr. Wm. Owen [Last Updated On: July 15th, 2023] [Originally Added On: June 29th, 2023]
- Thursday, 14th August 1913 Dr. William Owen Tells How Conleys Story Was Re-enacted [Last Updated On: June 13th, 2023] [Originally Added On: February 16th, 2021]
- Thursday, 14th August 1913 Financial Sheets Introduced At Frank Trial in Afternoon [Last Updated On: July 15th, 2023] [Originally Added On: July 3rd, 2023]
- Thursday, 14th August 1913 Former Office Boy Saw No Women With Frank on Thanksgiving Day [Last Updated On: July 15th, 2023] [Originally Added On: July 4th, 2023]
- Thursday, 14th August 1913 Lemmie Quinn is Severely Grilled by Solicitor Dorsey [Last Updated On: July 15th, 2023] [Originally Added On: July 2nd, 2023]
- Thursday, 14th August 1913 Lively Tilts Mark the Hearing Of Testimony of Dr. Kendrick [Last Updated On: July 15th, 2023] [Originally Added On: July 6th, 2023]
- Thursday, 14th August 1913 More Witnesses Are Called to Blacken Daltons Character [Last Updated On: July 15th, 2023] [Originally Added On: July 1st, 2023]
- Thursday, 14th August 1913 Mother of Frank Denounces Solicitor Dorsey in Court [Last Updated On: June 13th, 2023] [Originally Added On: February 17th, 2021]
- Thursday, 14th August 1913 Mrs. Rae Frank, Mother of Prisoner, Denounces Solicitor Hugh Dorsey [Last Updated On: July 15th, 2023] [Originally Added On: June 30th, 2023]
- Thursday, 14th August 1913 Quinn Intimates That Spots May Have Been on Floor for Months [Last Updated On: July 15th, 2023] [Originally Added On: July 5th, 2023]
- Thursday, 14th August 1913 Surprise Sprung by Introduction of Character Witnesses by Defense [Last Updated On: June 13th, 2023] [Originally Added On: February 15th, 2021]
- Friday, 15th August 1913 Cars Often Ahead of Schedule Declares a Street Car Man [Last Updated On: July 15th, 2023] [Originally Added On: June 20th, 2023]
- Friday, 15th August 1913 Character of Frank Good, So Many Witnesses Declare [Last Updated On: July 15th, 2023] [Originally Added On: June 21st, 2023]
- Friday, 15th August 1913 Defense Witness Admit Barrett is Sensible Fellow [Last Updated On: July 15th, 2023] [Originally Added On: June 11th, 2023]
- Friday, 15th August 1913 Eight Character Witnesses Come to Defense of Superintendent [Last Updated On: July 15th, 2023] [Originally Added On: June 9th, 2023]
- Friday, 15th August 1913 Elevator Made Loud Noise Said Employee of Pencil Company [Last Updated On: July 15th, 2023] [Originally Added On: June 13th, 2023]
- Friday, 15th August 1913 Factory Forewoman Swears Conley Said He Was Drunk on April 26 [Last Updated On: July 15th, 2023] [Originally Added On: June 25th, 2023]
- Friday, 15th August 1913 Factory Mechanic Tells of Blood on Floor From Mans Wounded Hand [Last Updated On: July 15th, 2023] [Originally Added On: June 18th, 2023]
- Friday, 15th August 1913 Frank in Jovial Mood While Poker Game Was Going on at His House on Night of 26th [Last Updated On: July 15th, 2023] [Originally Added On: June 14th, 2023]
- Friday, 15th August 1913 Frank Not Nervous on Night Of Murder Says Mrs. Ursenbach [Last Updated On: July 15th, 2023] [Originally Added On: June 23rd, 2023]
- Friday, 15th August 1913 Lawyers Appear Very Interested in Raincoat Lent to Leo M. Frank [Last Updated On: July 15th, 2023] [Originally Added On: June 10th, 2023]
- Friday, 15th August 1913 Many Men Swear to Good Character of Superintendent of Pencil Factory [Last Updated On: July 15th, 2023] [Originally Added On: June 28th, 2023]
- Friday, 15th August 1913 Milton Klein, Visitor of Frank, Is Grilled by Solicitor Dorsey [Last Updated On: July 15th, 2023] [Originally Added On: June 12th, 2023]
- Friday, 15th August 1913 Miss Eva May Flowers Did Not See Any Blood on Factory Floor [Last Updated On: July 15th, 2023] [Originally Added On: June 22nd, 2023]
- Friday, 15th August 1913 Mother-in-Law of Frank Denies Charges in Cooks Affidavit [Last Updated On: July 15th, 2023] [Originally Added On: June 27th, 2023]
- Friday, 15th August 1913 Pittsburg Witness Tells of Franks Standing in School [Last Updated On: July 13th, 2023] [Originally Added On: June 24th, 2023]
- Friday, 15th August 1913 Sig Montag Tells of Employment Of Detectives and Two Lawyers [Last Updated On: July 15th, 2023] [Originally Added On: June 17th, 2023]
- Friday, 15th August 1913 Sister of Mrs. Leo M. Frank Tells Jury About Card Game [Last Updated On: July 15th, 2023] [Originally Added On: June 26th, 2023]
- Friday, 15th August 1913 Two More Character Witnesses Are Introduced by the Defense [Last Updated On: July 15th, 2023] [Originally Added On: June 15th, 2023]
- Friday, 15th August 1913 Wife and Mother of Frank Are Permitted to Remain in Court [Last Updated On: July 15th, 2023] [Originally Added On: June 16th, 2023]
- Friday, 15th August 1913 Women Tell of Seeing Frank On Way to and From Factory On Day That Girl Was Murdered [Last Updated On: July 15th, 2023] [Originally Added On: June 19th, 2023]
- Saturday, 16th August 1913 Aged Negro Drayman Called As a Witness Against Conley [Last Updated On: July 15th, 2023] [Originally Added On: June 4th, 2023]
- Saturday, 16th August 1913 Both Wife and Phone, He Says, Are Expensive and Necessary [Last Updated On: July 15th, 2023] [Originally Added On: June 5th, 2023]
- Saturday, 16th August 1913 Credit Man is Put on Stand to Identify Franks Writing [Last Updated On: July 15th, 2023] [Originally Added On: June 6th, 2023]
- Saturday, 16th August 1913 Dorsey Asks Bauer Where He Spent the Dinner Recess [Last Updated On: October 10th, 2023] [Originally Added On: October 3rd, 2023]
- Saturday, 16th August 1913 Dorsey Questions Witness About Alleged Fund for Franks Defense [Last Updated On: July 15th, 2023] [Originally Added On: June 3rd, 2023]
- Saturday, 16th August 1913 Every Girl on Fourth Floor of Factory Will Go on Stand [Last Updated On: July 15th, 2023] [Originally Added On: June 2nd, 2023]
- Saturday, 16th August 1913 Factory Employees Testimony Causes Laughter in Court Room [Last Updated On: July 15th, 2023] [Originally Added On: June 7th, 2023]
- Saturday, 16th August 1913 Frank as Innocent as Angels Conley Told Her, Says Witness [Last Updated On: July 15th, 2023] [Originally Added On: May 25th, 2023]
- Saturday, 16th August 1913 Host of Witnesses Declare Franks Character to Be Good [Last Updated On: July 15th, 2023] [Originally Added On: June 1st, 2023]
- Saturday, 16th August 1913 Leo Frank Innocent, Said Conley, According to a Girl Operator [Last Updated On: July 15th, 2023] [Originally Added On: May 30th, 2023]
- Saturday, 16th August 1913 Maid in Schiff Home Tells of Phone Message From Frank [Last Updated On: July 15th, 2023] [Originally Added On: May 26th, 2023]
- Saturday, 16th August 1913 Miss Mary Perk Tells Jurymen She Believes Conley Is Guilty [Last Updated On: July 15th, 2023] [Originally Added On: May 29th, 2023]
- Saturday, 16th August 1913 Mother of Frank Takes Stand to Identify Letter Son Wrote [Last Updated On: July 15th, 2023] [Originally Added On: May 28th, 2023]
- Saturday, 16th August 1913 Mrs. Rae Frank Goes on Stand in Defense of Her Son [Last Updated On: July 15th, 2023] [Originally Added On: June 8th, 2023]
- Saturday, 16th August 1913 Never Saw Any Women in Office of Frank Says Negro Witness [Last Updated On: July 15th, 2023] [Originally Added On: May 31st, 2023]
- Saturday, 16th August 1913 Says Frank Broke Baseball Date Shortly After Girl Was Killed [Last Updated On: July 15th, 2023] [Originally Added On: May 23rd, 2023]
- Saturday, 16th August 1913 Still Another Office Boy Swears He Never Saw Women With Frank [Last Updated On: July 15th, 2023] [Originally Added On: May 24th, 2023]
- Saturday, 16th August 1913 Traveling Salesman for Montags Tells of Conversation With Frank [Last Updated On: July 15th, 2023] [Originally Added On: May 27th, 2023]
- Sunday, 17th August 1913 Prisoner's Mother Questioned As to Wealth of Frank Family [Last Updated On: October 10th, 2023] [Originally Added On: October 2nd, 2023]
- Sunday, 17th August 1913 That Pinkertons Double-Crossed Police, Dorsey Tries to Prove [Last Updated On: October 10th, 2023] [Originally Added On: October 1st, 2023]
- Monday, 18th August 1913 Frank May Tell Story to Jury on Stand Today [Last Updated On: January 27th, 2024] [Originally Added On: September 30th, 2023]
- Monday, August 18, 1913, Mary Phagan's Grandmother Dies After Dreaming Girl Was Living, Atlanta Constitution [Last Updated On: January 27th, 2024] [Originally Added On: September 29th, 2023]
- Monday, 18th August 1913 Men on Frank Jury Must Be Some Mighty Good Husbands Asserts the Deputy in Charge [Last Updated On: July 19th, 2023] [Originally Added On: July 9th, 2023]
- Tuesday, 19th August 1913 Books and Papers Put in Evidence by the Defense [Last Updated On: October 10th, 2023] [Originally Added On: September 28th, 2023]
- Tuesday, 19th August 1913 Climax of Trial Reached When Frank Faced Jury [Last Updated On: October 10th, 2023] [Originally Added On: September 27th, 2023]
- Tuesday, 19th August 1913 Frank Ends Statement After Testifying Four Hours [Last Updated On: August 31st, 2023] [Originally Added On: July 25th, 2023]
- Tuesday, 19th August 1913 Frank's Character Is Testified To By Long List Of Girls [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Tuesday, 19th August 1913 Harlee Branch Tells Of Conley Pantomine [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Tuesday, 19th August 1913 Mrs. Wardlaw Denies Ever Seeing Frank On Car With Little Girl [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Wednesday, 20th August 1913 Clashes Between Lawyers Mark Effort To Impeach Negro Cook [Last Updated On: April 4th, 2024] [Originally Added On: July 25th, 2023]
- Wednesday, 20th August 1913 Denies He Said He Was Willing To Lead Party To Lynch Frank [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Wednesday, 20th August 1913 Dr. Clarence Johnson Is Called To Corroborate Dr. Roy Harris [Last Updated On: April 4th, 2024] [Originally Added On: July 25th, 2023]
- Wednesday, 20th August 1913 Saw Mary Phagan On Her Way To Pencil Factory, Says Mccoy [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Wednesday, 20th August 1913 Sideboard In Leo Frank's Home Moved, Asserts Husband Of Cook [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Wednesday, 20th August 1913 State Is Hard Hit By Judge Ruling Barring Evidence Attacking Frank [Last Updated On: July 19th, 2023] [Originally Added On: July 12th, 2023]
- Wednesday, 20th August 1913 State Suffers a Severe Blow When Testimony Is Ruled Out [Last Updated On: October 10th, 2023] [Originally Added On: September 26th, 2023]
- Wednesday, 20th August 1913 Witness Swears He Saw Frank Forcing Unwelcome Attentions Upon the Little Phagan Girl [Last Updated On: July 24th, 2023] [Originally Added On: July 24th, 2023]
- Thursday, 21st August 1913 Frank Hooper Opens Argument In Leo Frank Case This Morning [Last Updated On: July 24th, 2023] [Originally Added On: July 20th, 2023]
- Thursday, 21st August 1913 Frank's Character Bad Declare Many Women and Girls on Stand [Last Updated On: July 19th, 2023] [Originally Added On: July 12th, 2023]
- Thursday, 21st August 1913 Girls Testify to Seeing Frank Enter Dressing Room With Woman [Last Updated On: July 19th, 2023] [Originally Added On: July 12th, 2023]
- Thursday, 21st August 1913 Girls Testify to Seeing Frank Talking to Little Mary Phagan With His Hands on Her Person [Last Updated On: July 24th, 2023] [Originally Added On: July 20th, 2023]
- Thursday, 21st August 1913 Leo Frank Takes Stand Again Despite Objection of Dorsey [Last Updated On: July 24th, 2023] [Originally Added On: July 20th, 2023]
- Thursday, 21st August 1913 Railway Employee Swears Car Reached Center of City at 12:03 [Last Updated On: August 7th, 2023] [Originally Added On: July 20th, 2023]
- Thursday, 21st August 1913 Starnes Tells How Affidavit From Negro Cook Was Secured [Last Updated On: July 24th, 2023] [Originally Added On: July 19th, 2023]
- Thursday, 21st August 1913 Swears That Frank Prepared Sheets in Less Than 2 Hours [Last Updated On: July 19th, 2023] [Originally Added On: July 12th, 2023]
- Thursday, 21st August 1913 Testimony of Dr. Harris Upheld By Noted Stomach Specialists [Last Updated On: July 24th, 2023] [Originally Added On: July 19th, 2023]
- Thursday, 21st August 1913 Testimony of Hollis Assaulted by Witness [Last Updated On: July 24th, 2023] [Originally Added On: July 19th, 2023]
- Friday, 22nd August 1913 Arnold Ridicules Plot Alleged By Prosecution And Attacks The Methods Used By Detective [Last Updated On: January 21st, 2024] [Originally Added On: July 26th, 2023]
- Friday, 22nd August 1913 Chronological Table Of Frank's Actions On Day Of Murder [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Friday, 22nd August 1913 Frank Case May Go To Jury Late This Afternoon [Last Updated On: August 30th, 2023] [Originally Added On: July 26th, 2023]
- Friday, 22nd August 1913 In Dramatic Phrases Hooper Outlines Events Leading Up To And Following Death Of Girl [Last Updated On: August 30th, 2023] [Originally Added On: July 25th, 2023]
- Saturday, 23rd August 1913 Dorsey's Brilliant Address Attacking Leo Frank Is Stopped By Adjournment Of Court Friday [Last Updated On: August 30th, 2023] [Originally Added On: July 26th, 2023]
- Saturday, 23rd August 1913 Rosser Makes Great Speech For The Defense. Scores Detectives And Criticizes The Solicitor [Last Updated On: August 30th, 2023] [Originally Added On: July 26th, 2023]
- Sunday, 24th August 1913 Many Records Are Badly Broken By State's Most Expensive Trial [Last Updated On: August 30th, 2023] [Originally Added On: July 26th, 2023]
- Sunday, 24th August 1913 Solicitor Reasserts His Conviction Of Bad Character And Guilt Of Frank [Last Updated On: August 30th, 2023] [Originally Added On: July 29th, 2023]
- Monday, 25th August 1913 Leo Frank's Fate May Be Decided By Monday Night [Last Updated On: August 30th, 2023] [Originally Added On: July 29th, 2023]
- Tuesday, 26th August 1913 As Bells Tolled, Dorsey Closed Magnificent Argument Which Fastened Crime On Frank [Last Updated On: August 30th, 2023] [Originally Added On: July 29th, 2023]
- Tuesday, 26th August 1913 Frank Convicted, Asserts Innocence [Last Updated On: August 30th, 2023] [Originally Added On: July 28th, 2023]
- Tuesday, 26th August 1913 Glad And Relieved Trial Is Over. No Doubt Of Leo Frank's Guilt. Mrs. J. W. Coleman [Last Updated On: August 30th, 2023] [Originally Added On: July 28th, 2023]
- Tuesday, 26th August 1913 Guilty, Declares Jury [Last Updated On: August 30th, 2023] [Originally Added On: July 28th, 2023]
- Tuesday, 26th August 1913 Here Is The Chronological Order Of Final Day Of Frank's Trial [Last Updated On: August 30th, 2023] [Originally Added On: July 27th, 2023]
- Tuesday, 26th August 1913 Leo Frank Received Fair Trial Declares Chief Newport Lanford [Last Updated On: August 30th, 2023] [Originally Added On: July 27th, 2023]
- Tuesday, 26th August 1913 Mary Phagan, The Victim [Last Updated On: August 30th, 2023] [Originally Added On: July 27th, 2023]
- Wednesday, 27th August 1913 Frank Sentenced On Murder Charge To Hang October 10 [Last Updated On: August 30th, 2023] [Originally Added On: July 27th, 2023]
- Wednesday, 27th August 1913 Hugh Dorsey's Great Speech Feature Of The Frank Trial By Sidney Ormond [Last Updated On: August 30th, 2023] [Originally Added On: July 30th, 2023]
- Thursday, 28th August 1913 Jail Cell Of Leo M. Frank Now Like Living Room [Last Updated On: August 30th, 2023] [Originally Added On: July 30th, 2023]
- Friday, 29th August 1913 Leo M. Frank To Make No Public Statement [Last Updated On: August 30th, 2023] [Originally Added On: July 27th, 2023]
- Sunday, 31st August 1913 Graduates Of Cornell Will Aid Leo M. Frank In Fight For Life [Last Updated On: August 30th, 2023] [Originally Added On: July 30th, 2023]
- Thursday, 4th September 1913 Frank Trial Bills Are Ordered Paid [Last Updated On: April 25th, 2024] [Originally Added On: February 17th, 2024]
- Friday, 5th September 1913 Grand Jury May Act On Jim Conley Today [Last Updated On: April 25th, 2024] [Originally Added On: February 17th, 2024]
- Tuesday, 9th September 1913 Judge Roan Urged For New Judgeship [Last Updated On: April 25th, 2024] [Originally Added On: February 13th, 2024]
- Wednesday, 10th September 1913 Longer Vacation Given Phagan Case Workers [Last Updated On: April 25th, 2024] [Originally Added On: February 8th, 2024]
- Thursday, 11th September 1913 Judge Hill May Get Atlanta Judgeship [Last Updated On: April 25th, 2024] [Originally Added On: February 8th, 2024]
- Friday, 12th September 1913 Plennie Minor Will Barbecue Tomorrow [Last Updated On: February 17th, 2024] [Originally Added On: February 7th, 2024]
- Saturday, 13th September 1913 Classmate Of Leo Frank Writes Warm Defense [Last Updated On: April 25th, 2024] [Originally Added On: February 3rd, 2024]
- Sunday, 14th September 1913 Ben Hill Will Go On Fulton Bench As Fourth Judge [Last Updated On: February 17th, 2024] [Originally Added On: February 8th, 2024]
- Monday, 15th September 1913 Are Burns Men Here [Last Updated On: April 25th, 2024] [Originally Added On: February 11th, 2024]
- Tuesday, 16th September 1913 Jim Conley's Lawyer Planning His Defense [Last Updated On: April 25th, 2024] [Originally Added On: February 8th, 2024]
- Wednesday, 17th September 1913 No Bill Is Found Against Newt Lee [Last Updated On: February 17th, 2024] [Originally Added On: February 8th, 2024]
- Thursday, 18th September 1913 Jews Are Organizing To Stop Defamation [Last Updated On: April 28th, 2024] [Originally Added On: February 29th, 2024]
- Friday, September 19, 1913 Delay In Hearing Of Plea For Frank, The Atlanta Constitution [Last Updated On: February 17th, 2024] [Originally Added On: January 22nd, 2024]
- Saturday, 20th September 1913 Beavers Will Teach Police What To Do In Big Murder Case [Last Updated On: February 17th, 2024] [Originally Added On: February 13th, 2024]
- Sunday, 21st September 1913 Great Watch Finders [Last Updated On: February 17th, 2024] [Originally Added On: February 13th, 2024]
- Wednesday, September 24, 1913 Leo Frank Again Made President Of B'nai B'rith, Atlanta Constitution. [Last Updated On: April 25th, 2024] [Originally Added On: February 1st, 2024]
- Friday, 26th September 1913 Did Not Discuss Guilt Of Frank [Last Updated On: April 25th, 2024] [Originally Added On: February 11th, 2024]
- Saturday, 27th September 1913 Smith And Arnold Indicted For Fight [Last Updated On: April 25th, 2024] [Originally Added On: February 11th, 2024]
- Sunday, 28th September 1913 Grief Of Mrs. Coleman Is A Pitiful Sight [Last Updated On: April 25th, 2024] [Originally Added On: February 11th, 2024]
- Tuesday, 30th September 1913 Speculation Is Rife As To Who'll Hear Leo Frank?s Motion [Last Updated On: April 28th, 2024] [Originally Added On: February 29th, 2024]
- Monday, 9th March, 1914, Leo Frank Answers List of Questions Bearing on Points Made Against Him, The Atlanta Constitution [Last Updated On: November 13th, 2023] [Originally Added On: July 21st, 2021]